FAQs
The typical new fee for an RPZ permit is $95 per vehicle. However, some Zones are subsidized by nearby major institutions because their employees and/or students impact parking. For specific fees by Zone and area, please see the chart below.
How do I renew my RPZ permit in Seattle? ›
You will need to find your RPZ License (it will have a status of “about to expire”), and on the right side of the screen you should see an option to “Renew.” If you do not already have a Seattle Services Portal account, you will need to create one before you try to renew online.
What is the phone number for the RPZ in Seattle? ›
We can be reached Monday through Friday, between 8:30 a.m. and 4:30 pm at (206) 684-5086, or rpzinfo@seattle.gov.
What insulation zone is Seattle? ›
For homes in the Seattle, Washington area, we've already established that the correct insulation R-value climate zone is 4. If you look at the chart above, you can see that the attic should achieve an R-value between R-38 and R-60, depending on the current insulation levels.
Do I need a permit to remodel my bathroom Seattle? ›
What Permits Do You Need? You need a construction addition / alteration permit to build an addition or remodel. If the size of the addition or remodel is small, you may qualify for a subject-to-field inspection permit. You may also need to apply for electrical service changes or new services from Seattle City Light.
How much does backflow testing cost in Seattle? ›
Prices - Backflows Northwest. A residential Backflow Assembly Test* starts at $55.00 per device.
Can you do your own plumbing in Seattle? ›
Can I do my own plumbing work? In the State of Washington, Chapter 18.106 RCW contains the rules and regulations governing plumber certification. An owner may perform their own plumbing work. They may also enlist the help of a friend, neighbor, relative, or other acquaintance, as long as they are not compensated.
How long are Seattle building permits good for? ›
Construction, demolition, mechanical, and grading permits typically expire 18 months after the issue date. However, you can renew these permits up to 30 days before the expiration date. You can reestablish your permit if it has been expired for less than one year.
How to get a zone 2 parking permit in Seattle? ›
You can submit applications for all permit types online through the Seattle Services Portal. Our staff will be available to provide application coaching and assist with issuing permits by phone or e-mail.
Is Seattle rent control? ›
Myth: Rent control is illegal.
The Washington State Legislature passed a ban on rent control in 1981. If today's majority Democrat-dominated Legislature wants to, they could repeal that law in moments. But we cannot simply hold our breath for that to happen, while the housing crisis keeps growing in our city.
You will need to go online and enter your personal information and pay a one-time set up fee. For additional assistance, call the Seattle Public Utilities office at (206) 684-3000.
How do I pay my rent in Seattle? ›
Paying rent
- Open a bank account if you don't already have one.
- Set up online access to your bank account.
- Click on “bill pay” to make payments online.
- Add Seattle Housing Authority as a payee, using this address: PO Box 84025, Seattle WA 98124-8425.
- For "account number," use your Resident ID number (T-Code).
What is the average R-value for an attic? ›
Depending on where you live and the part of your home you're insulating (walls, crawlspace, attic, etc.), you'll need a different R-Value. Typical recommendations for exterior walls are R-13 to R-23, while R-30, R-38 and R-49 are common for ceilings and attic spaces.
Is insulation mandatory in WA? ›
Under the building code of Australia, all new homes in Perth are required to have an insulation with a minimum value of 4.1 for all ceilings and bulkheads and 2.8 for the walls, depending on type. Homeowners are encouraged to have a retrofit of new insulation to meet these standards.
What is Seattle's hardiness zone? ›
As a new gardening season dawns, Seattle has landed in Zone 9a — the same zone as northern Florida. According to the USDA, about half of the country edged up half a zone, the equivalent of 5 degrees Fahrenheit, and two new zones were added, 12 and 13.
How much does a permit cost in Washington? ›
Getting your first WA permit
First instruction (learner's) permit | More information | Total* |
---|
First instruction (learner's) permit Learner's permit | More information See Instruction (learner's) permits Also called Instruction permit | Total* $25 for 1 yr |
5 more rows
How much is the 60 day trip permit in Washington state? ›
Once you have compiled the missing document and or documents, come back into Wendel's License so we can complete the temporary transaction and supply you with license plates and registration. In most cases the completion of the 60 day temporary will cost $32.75 to complete.
What is the penalty for building without a permit near Seattle WA? ›
Fines. If you build without a permit, you may be fined up to $500 per day.
Do I need a permit for moving truck Seattle? ›
If you're moving in Seattle, you'll want to find parking for your moving truck as close to the address as possible. Easier said than done. You'll need to get multiple permits from the city + rent and post No Parking barricades at the address 72 hours prior to the start date.